Case studies

Proof from the floor,
not the lab.

Real plants, real numbers. Here’s what manufacturers get from Jemba when they put it on the line — measured in scrap, downtime, energy and ROI.

Featured · Automotive

From 30% to 80% yield
across 12 production lines.

A global Tier-1 automotive supplier used Jemba to correlate 700+ process variables down to the 4 critical parameters causing 83% of yield loss — then rolled the fix across 12 lines in six months.

Read the full case
2.7×
ROI in year one
−58%
scrap
>€2M
saved / year
18
weeks to deploy
12
lines in 6 months
99.7%
uptime
450+
plants equipped
30+
countries
2.7×
typical year-one ROI
48h
to install
Get started

Your line could be the next case study.

Book a 15-minute demo or start a free trial. 48-hour setup, no data scientist required.